1.2008 Beijing Olympic National Aquatic Centre
 
  (AEX PA System equipments are fully installed in both indoor and outdoor section of the stadium.)  
  The National Aquatic Centre also known as the Water Cube is being built alongside Beijing National Stadium in the Olympic Green. It is seen as the most accomplished infrastructure attraction of the 2008 Beijing Olympic. The national aquatic centre is situated on the northern part of Beijing city, beautifully illustrating a contrast between modern rise infrastructure and Beijing's glorious historical landmark. The National Aquatic Centre has a built-up area of 62950 m2, on a land area of 80000 m2.

 
 

Olympic National Aquatic Centre


 
  2.2008 Beijing Olympic Laoshan Track Cycling Sports Venue  
  (AEX PA System equipments are fully installed in both indoor and outdoor section of the stadium.)

 
  Name of Venue : Laoshan Velodrome
Location : Laoshan, Shijingshan District, Beijing City, China. (Situated in
the western part of existing cycling and fencing administration)

Total Land Surface : 32920 m2

The Beijing Olympic Velodrome is located in Laoshan, Shijingshan District of Beijing, occupying an approximate 6.6-hectare of land. It has a built-up area of 32,920 m2. The 250-metre oval shaped track has a capacity of 6,000 spectators including 3000 temporary seating. The colossal disc-shaped velodrome abstractly reflects the circular spoked wheel of a racing bicycle, fully displaying the motion of cycling. Upon completion, Laoshan Velodrome will be China's first indoor velodrome that has wood-constructed cycling track. Financed by the Central Finance Ministry of People's Republic of China, the cost of this project is around 360 million RMB. During the 2008 Olympic games, a historic of 12 gold medals will be given away in Laoshan Velodrome.
 
 


Laoshan Velodrome



 
  3. 2008 Beijing Olympic Wukesong Culture & Sports Center
(As the official 2008 Beijing Olympic Basketball competition venue, fully operating on AEX PA System equipments)

 
  Location: Wukesong Culture & Sports Center
Total Land Surface:
63,000 m2
Games Sports Venue:
Basketball
Post Games Use: The sport center, will include Beijing Olympic Basketball
Gymnasium, Wukesong Baseball field, various cultural & sporting and commercial facilities. Wukesong Culture & Sports Center will satisfy the resident's needs for a commercial, cultural, sporting and recreation center in the western part of Beijing City.

 
 

Wukesong Basketball Gymnasium



 
  4. 2008 Beijing Olympic National Tennis Centre
(As the official 2008 Beijing Olympic Tennis competition venue, fully operating on AEX PA System equipments)


 
  The hosting venue for the Tennis competition event will be held in the newly built National Tennis Centre which is located inside the Olympic Green. The National Tennis Centre has a capacity of 21,400 seats, which includes the Main Court, Court No.1, Court No.2 and seven other competition courts with sufficient temporary seats.  
 
 
 

Beijing Olympic National Tennis Centre



 
  5. Olympic Urban Road Cycling Course  
     
  The 2008 Beijing Olympic Road Race Cycling's Operational Divisions are situated at the starting point in Yongdingmen and Finishing point in Juyongguan. Both Starting and Finishing Destination venues have their own separate individual designs and functions. The Starting Destination venue occupies 10 hectares of land while the Finishing Destination venue expands up to 15 hectares of land. In order to design an ideal PA system according to the characteristic features of the competition venues, AEX has proposed a programmable preamplifier (XP138) solution as the main signal management to various Operational divisions such as Athlete Camp, Administrative Center, Media Center, Logistic Supply & Security Center, and Drug Testing Division. The Emergency Firemen broadcast will be the highest priority for all outdoor public areas and respective division centers.
 
 


Starting Point (Yongdingmen Square)





Finishing Point (Juyongguan Square)
 

Site Map | Privacy Policy | Terms of Use
2005 - 2006 AEX System. All Rights Reserved.